Saturday, 20 June 2026

Good morning, Mariana

Architect · ECI lead · document control · VL overseas team · Bold Metals shop drawings

HERO PASSPORT · DESIGN

Mariana Prado

Lead Architect

HERO CLASS · Design Visionary

SUPERPOWER · Design Intelligence & Spatial Mastery

ENERGY

★★★★

4.3 / 5

+0.2 vs last wk

FOCUS

★★★★★

4.8 / 5

DA week · locked in

WELLBEING

★★★★

4.0 / 5

Sleep 7.4h avg

DECISIONS

★★★★

4.5 / 5

9 design calls · 0 stuck

MOMENTUM

★★★★★

4.7 / 5

DA submit run

YEARS · HBP

4.4

SINCE 3 FEB 2022

KPIS · YTD

49/52

94% · TOP QUARTILE

LEAVE BANK

17.5 d

12 AL · 4 PL · 1.5 LSL

NEXT MILESTONE

221 d

5Y TENURE · 3 FEB 27

WE BUILD · WE PROTECT · WE INSPIRE OPEN FULL PASSPORT →

CONNECTION POINTS · reports to · manages · collaborates

PERSONAL COCKPIT · TODAY

Good evening, Mariana

Friday 28 June 2026 · 17:42 AEST · Carlton VIC. Two stamps to clear, the structural sign-off thread with PowerStruct to close, and a walk-in DA submission at Whitehorse Council first thing tomorrow.

AI VOICE · GENERATED 17:38

AI BRIEF · TRANSCRIPT

24 SECONDS

"Good evening Mariana. EOD list: 3 design call-outs — finalise the 21 Tyrrell structural sign-off with PowerStruct, send Drazen the revised setout PDF for 142 Bay, and sign off 12 Kira's occupancy cert for Daniel. Tomorrow you're walking the 21 Tyrrell DA in person to Whitehorse Council at 09:00 — they close the counter at 12:00, so beat the traffic. Carlton is 12° clear in the morning, easy 35 min run via Eastern Fwy. I've drafted the Drazen setout note — want me to send it?"

EMAILS · 9 UNREAD · 3 CRITICAL
CRIT

Whitehorse Council · 21 Tyrrell DA — checklist confirmed

10:14 · counter open 09:00–12:00 Mon

CRIT

PowerStruct (engineer) · 21 Tyrrell loads — sign-off needed

13:02 · holds DA lodgement

CRIT

Daniel Lo Bello · 12 Kira occupancy cert · final sign-off

14:48 · handover cert pack ready

SOON

Tristan · 142 Bay concept — owner review window?

16:05 · wants the v2 sketch by Tue

FYI

Owner · 142 Bay · "loving the brief, ready when you are"

15:28 · no action today

CHATS · 6 UNREAD · 2 DM
DM

Drazen · "need setout PDF for slab Monday — can you push?"

Teams · 16:22 · 14 min ago

DM

Tristan · "DA walk-in confirmed for tmrw — call me if council pushes back"

Teams · 16:01

@TEAM

#21-tyrrell · Zee posted updated cost plan v3

12 reactions · review before DA

CH

#design-ops · 3 new drawing register updates

142 Bay + 12 Kira + 21 Tyrrell rev

CH

#142-bay-concept · Sumayya queried lot setbacks

14:33 · 1 reply needed

TODAY · 6 ITEMS · 2 OVERDUE
!!

Chase PowerStruct on structural cert · 21 Tyrrell

OVERDUE · was due 14:00

!!

Send Drazen the revised setout PDF · 142 Bay

OVERDUE · was due 16:00

EOD

Sign off 12 Kira occupancy cert · Daniel waiting

Stamp + upload to OneDrive handoff folder

EOD

Print full DA submission bundle · 21 Tyrrell

A3 colour x 3 copies · for council walk-in

TMRW

Sketch 142 Bay concept v2 for owner review

2hr block · before lunch

PERS

Pick up DA print pack from Officeworks Carlton

Personal · 5 min from home

ROUTE · HOME → 21 TYRRELL · DA SUBMIT · TMRW 09:00

23 KM · 35 MIN

EASTERN FWY → SPRINGVALE RD · LEAVE 08:20 · COUNCIL CLOSES 12:00

WEATHER · CARLTON

17:42

12°

FEELS 10° · CLEAR

HUMID

64%

WIND

11 NW

UV

2 LOW

DRY RUN · NO BUFFER NEEDED

TMRW · 3 MEETINGS

FULL DAY →
  • 09:00

    DA walk-in · Whitehorse Council

    21 Tyrrell submit · 45 min · drive 35

  • 13:00

    Owner review · 142 Bay

    w/ Tristan · concept v2 walk-through · HQ

  • 16:00

    Design-ops standup

    w/ Zee, Sumayya · 30 min

AI SUGGESTIONS · 4 ACTIONS

RANKED BY URGENCY

Walk the 21 Tyrrell DA in person to Whitehorse before 11:00 — counter closes at 12:00 Monday, walk-in beats the e-lodge queue by 5 working days.

Reply to PowerStruct on the 21 Tyrrell loads — I've drafted the response confirming footing detail and slab thickness, ready to send and unlock DA lodgement.

Send Drazen the revised setout PDF for 142 Bay — he needs it for Monday's slab pour. I have the latest rev queued.

Schedule owner review on 142 Bay concept — Tristan flagged Tuesday window; I've found a 13:00 slot that works for both.

DRAFT · UNSUBMITTED

DAILY LOG · 28 JUN 2026 · FRI

Site diary · timesheet · auto-allocated inbox · OneDrive backup · job cost roll-up

SITE DIARY · TODAY DRAFT

SITES VISITED · 8.0 HRS

21 Tyrrell · 2.0H Whitehorse Council · 1.0H HQ design · 4.5H 142 Bay · 0.5H
Weather12° clear NW 11
Crew on siteN/A · design day
Photos uploaded8 / 5 target ✓
Holds / blockersPowerStruct sign-off pending
Safety incidentsclear
Drawings issued3 · 21 Tyrrell rev D
INBOX → JOB COST CENTRE AI · LIVE

11 scanned today · 10 auto-allocated to your design lead bucket · 1 needs your call

21 Tyrrell Ave · Blackburn

6 emails · council, PowerStruct, Tristan · DA submit

2.0H

AUTO

12 Kira · Occupancy cert

3 emails · Daniel, owner · sign-off thread

0.8H

AUTO

142 Bay · Concept · REVIEW

2 emails · owner + Sumayya · setback query

0.5H

PENDING

ONEDRIVE BACKUP PENDING
Last full sync02:00 today
Live mirror3 min ago ✓
Today's logqueued · unsigned
Queued files5 (diary + 3 dwgs + cert)
Storage312 GB / 1 TB

DESTINATION PATH

/1reference/daily-logs/
2026-06-28_MarianaPrado.json

Submit to lock the day's entry and push to backup.

JOB COSTING · INTERNAL TEAM HOURS · YOUR ALLOCATION LEAD ARCHITECT RATE · $190/HR · COMPARED TO ALLOCATED BUDGET
Job / address Your role Budget Spent WTD Today + Used % Status

21 Tyrrell Ave

Blackburn VIC · DA submit

Design lead $22,000 $21,470 +$380
99%
OVER · $230

142 Bay St

ECI · concept stage

Design lead · ECI $14,000 $5,420 +$95
39%
ON BUDGET

12 Kira

Postcon · occupancy cert

Design wrap-up $6,500 $5,720 +$152
88%
WATCH

Internal · Design Ops

Hillbrook · drawings + standards

Design lead $9,000 $5,100 +$893
67%
ON BUDGET

TODAY TOTAL

8.0 hrs · 4 jobs · auto-allocated from inbox + calendar + diary

$51,500 $37,710 +$1,520
76%
PORTFOLIO WATCH

AI flagged: 21 Tyrrell design budget is at 99% with DA still to lodge — recommend re-baselining with Tristan or shifting council-liaison hours to Zee.

YOUR PERSONAL PROJECTS · 4 ACTIVE

SEE ALL →

21 TYRRELL · DA SUBMIT

Design · due 1 Jul · 95%

142 BAY · CONCEPT

ECI · due Aug · 40%

DESIGN SYSTEM · DRAWINGS

Ops · due Sep · 68%

12 KIRA · OCCUPANCY CERT

Postcon · due Jul · 88%

Mariana — 5 things to clear today

  • 3 plans awaiting your stamp · CAR118 v4, SAX7 v3, TYR21 v6
  • CAR26 structural clash · Freddie + Sumayya tagged you 18h ago
  • 2 VL handoffs back from Bangalore overnight · ready for review
  • Weekly client update due · 4 ECI clients
  • Bold Metals shop drawings · 2 sets sitting in your review queue (5d old)

Your work at a glance

ECI active

5

FOR153 · CAR118 · SAX7 · TYR21 · BEL2

Plans to stamp

3

Oldest: SAX7 · 3d waiting

ECI brought in YTD

$680k

+34% YoY · pace for $1.4M

Shop drawings · Bold M

7

2 review · 4 detailing · 1 issued

VL queue

6

3 with VL · 2 returning · 1 brief pending

ECI tracker · your workflow

Imported from Asana [SALES] · feeds the CEO portfolio view · 5 active ECIs

Open in Asana

Contract triage · design within these parameters

In scope · design to this

  • 6 ensuite rooms · SDA Improved Liveability
  • Level access shower in every ensuite
  • Grab rails to AS 1428.1
  • Reverse cycle aircon, all rooms
  • Communal kitchen + laundry
  • Solar 6.6 kW + battery prep

Out of scope · do not include

  • Pool / spa
  • Outdoor kitchen / pergola
  • Electric vehicle charger
  • Smart-home automation beyond SDA spec
  • Stone benchtops (laminate per spec)

Constraints · watch these

  • Budget cap

    $2.40M total · $400k/ensuite

  • Programme

    Site start 22 Sep · slab 30 Sep

  • Materials

    No imported tiles · NDIS supplier list

  • Council overlay

    Whitehorse heritage interface · setback 4.5m

AI source: Head contract executed 12 Mar · SDA technical schedule v3 · client letter 8 May · clause 14.2 variations

Document control · approval pipeline

Drafted → VL detail → You review → Caleb audit → Stamp → Issue

TYR21 — Architectural set

Rev 6 · 24 sheets · A-1.01 → A-5.04

1 2 3 4 5 6
Your review

CAR118 — Architectural set

Rev 4 · 18 sheets · VL flagged clash at A-3.02

1 2 3 4 5 6
Your review

SAX7 — Architectural set

Rev 3 · 16 sheets · clean

1 2 3 4 5 6
Caleb audit

FOR153 — Architectural set

Rev 5 · 21 sheets · stamped 19 Jun · LATEST · live on site

1 2 3 4 5 6
Stamped

BEL2 — Concept set

Rev 1 · 8 sheets · VL detailing

1 2 3 4 5 6
VL detail

Latest-plans enforcement: ALL site teams building from current revisions

Audit clean · 12 trades synced

VL Bangalore · overseas team

VL local time

06:08 IST · IN OFFICE

Active handoffs

  • CAR118 · detailed drafting

    With VL · 2d

    Brief: SDA bath details + grab rail spec. Back: 22 Jun

  • SAX7 · facade resolution

    With VL · 4d

    Brief: render passes + window schedules. Back: 23 Jun

  • TYR21 v6 ↑ returned overnight

    For your review

    Open in Revit · 24 sheets · audit log attached

  • BEL2 v1 brief · ready to send

    Send today

    Concept attached · scope memo drafted

Daily standup: 10:00 AEST · 5:30 IST

Open Teams ↗

Bold Metals · shop drawings

Workflow synced

Active sets · 7 total

  • CAR26 · stair package

    5d in review

    12 risers · stainless · Chloe at Bold Metals waiting

  • KRO25 · stair package

    5d in review

    10 risers · powdercoat black · Chloe waiting

  • HIG44 · balustrade

    Detailing

    36m run · 2 returns · VL working

  • FOR153 · balustrade

    Issued

    Bold Metals fabricating · ETA on site 5 Aug

Time on Bold Metals work · June

34h

Billed to Bold Metals @ Hillbrook design rate · $4,420 · invoice raised

ECI brought in · 4-year performance

+34% YoY · on track for $1.4M

$520k

base

2023

$760k

+46%

2024

$1.05M

+38%

2025

$1.40M (fcst)

YTD $680k
+ $720k fcst

2026

SDA work

$420k

+58% YoY · TYR21, CAR118, SAX7

Rooming houses

$165k

+22% · BEL2 incoming

Townhouses

$74k

−8% · FOR153 only

Bold Metals design

$21k

+new line item · 4 shop draw sets

Client comms · weekly cadence

4 due
  • TYR21 · YARRA Housing Due today

    AI draft ready: "Rev 6 issued for sign-off · engineer RFI 14 closed · slab start tracking to 30 Sep"

  • CAR118 · client (NDIS investor) Due Mon

    AI draft ready: "Bundle savings vs SAX7 quantified · costs locking week of 30 Jun"

  • SAX7 · client Due Wed

    AI draft ready: "Facade resolution back from VL · render attached for sign-off"

  • FOR153 · Tedeschi Sent Thu

Engineering · RFIs & threads

3 active
  • Hayes · TYR21 RFI 014 2h

    Footing detail amendment — awaiting your sign-off

  • McCarthy · CAR26 clash 18h

    Structural beam intrudes ceiling void — Freddie + Sumayya tagged

  • PowerStruct · CAR118 frame 2d

    Lintel sizing query — VL has the brief

Your ECIs

T C S F B Melbourne