Saturday, 20 June 2026

Good morning, Drazen

Site Manager · Northwest · SDA specialist · 5 active · 2 handover · 1 pre-site · home base Greenvale

HERO PASSPORT · CONSTRUCTION

Drazen Grgat

Site Manager

HERO CLASS · Site Commander

SUPERPOWER · Site Control & Problem Solving

ENERGY

★★★★

4.4 / 5

Early starts hold

FOCUS

★★★★

4.5 / 5

+0.2 vs last wk

WELLBEING

★★★★★

3.7 / 5

Long days · dusty

DECISIONS

★★★★

4.6 / 5

9 calls · 0 stuck

MOMENTUM

★★★★

4.5 / 5

7-day streak

YEARS · HBP

4.8

SINCE 9 SEP 2021

KPIS · YTD

45/52

87% · TOP QUARTILE

LEAVE BANK

15.0 d

9 AL · 5 PL · 1 LSL

NEXT MILESTONE

73 d

5Y TENURE · 9 SEP 26

WE BUILD · WE PROTECT · WE INSPIRE OPEN FULL PASSPORT →

CONNECTION POINTS · reports to · manages · collaborates

PERSONAL COCKPIT · TODAY

Good evening, Drazen

Friday 28 June 2026 · 17:42 AEST · Williamstown VIC. Programme update for Tristan still open, plumber chase rolled to Monday, 2 new chippies to induct first thing. 06:30 toolbox at 73 Princes tomorrow.

AI VOICE · GENERATED 17:38

AI BRIEF · TRANSCRIPT

27 SECONDS

"Evening Drazen. EOD wrap: 3 things open — programme update for Tristan still in drafts, PO for stair balustrade waiting on Caleb, and the Reservoir HWS plumber didn't show at 09:00 so escalate to Caleb. Tomorrow Saturday — 06:30 toolbox at 73 Princes, then 2 new chippies to induct at 07:00 with Daniel. Williamstown to Werribee via Westgate is 22 km · 28 min at that hour, leave 06:00. I've drafted the programme update for Tristan — want me to send it?"

EMAILS · 9 UNREAD · 2 CRITICAL
CRIT

Caleb Horne · PO for stair balustrade — supplier waiting

15:48 · raise tonight or slips Monday

CRIT

Mariana Prado · 73 Princes Rev C — bathroom layout change

14:22 · re-issue to tilers before Mon

SOON

Tristan Angelini · programme check-in · need % by EOD

16:05 · draft saved · review & send

SOON

Reservoir HWS (sub) · "stuck at Coburg, rebook?"

09:14 · 09:00 no-show · escalated

FYI

21 Tyrrell sparky · rough-in done · ready for inspection

12:30 · book Mon AM

CHATS · 11 UNREAD · 3 DM
DM

Caleb · "raise the balustrade PO — supplier locking truck"

Teams · 15:50 · 1h ago

DM

Daniel · "07:00 induct the 2 chippies — I'll bring forms"

Teams · 16:40

DM

Malcolm · "swapping plasterer Mon if you're cool with it"

WhatsApp · 14:18

@TEAM

#73-princes · 18 site photos posted · concrete pour

06:20 · 5 reactions · tag client?

CH

#subbies · Mon deliveries: 3 trucks 73 Princes, 1 Tyrrell

15:32 · access plan attached

TODAY · 6 ITEMS · 2 OVERDUE
!!

Raise PO for stair balustrade with Caleb

OVERDUE · was due 15:00 · supplier hold

!!

Send programme update to Tristan (drafted)

OVERDUE · was due 16:00 · review & send

EOD

Sign 3 timesheets in Procore (Luca / James / Kyle)

Friday close · ~4 min

EOD

Escalate Reservoir HWS no-show to Caleb

Rebook Mon or swap sub

TMRW

Toolbox 06:30 + induct 2 new chippies at 07:00

Daniel bringing inductions forms

PERS

Carpentry upskill module 4 · 45 min

Personal · Sun morning slot

ROUTE · HOME → 73 PRINCES · 6:30 START · TMRW 06:30

22 KM · 28 MIN

WESTGATE FWY → PRINCES FWY · LEAVE 06:00 · CLEAR

WEATHER · WILLIAMSTOWN

17:42

12°

FEELS 9° · BAYSIDE CHILL

HUMID

72%

WIND

22 SW

UV

1 LOW

DAWN 7:20 · HEAD-LAMPS ON TOOLBOX

TMRW · 3 MEETINGS

FULL DAY →
  • 06:30

    Toolbox · 73 Princes Hwy, Werribee

    Daily start · 20 min · 14 crew

  • 07:00

    Induct 2 new chippies · w/ Daniel

    Inductions + site walk · 40 min

  • 11:00

    Drop into 21 Tyrrell · sparky inspect

    Blackburn · drive 38 min from Werribee

AI SUGGESTIONS · 4 ACTIONS

RANKED BY URGENCY

Send the programme update to Tristan — drafted: "Tristan, 73 Princes tracking 82% to lock-up, on for 18 Jul. 21 Tyrrell fit-out starts Mon. One hold: Reservoir HWS no-show, swap likely. Crew at 14, no safety. Full update in Procore."

Raise the stair balustrade PO with Caleb — supplier holding truck for tonight, $4,820 inc. Match to 73 Princes cost code 6020.

Pre-stage the 07:00 induction with Daniel — both chippies' tickets verified in Builddee, just need site-specific brief and SWMS sign-off.

Dial Caleb to escalate the Reservoir HWS no-show — recommend swap to backup plumber Mon AM, no slippage on lock-up.

DRAFT · UNSUBMITTED

DAILY LOG · 28 JUN 2026 · FRI

Site diary · timesheet · auto-allocated inbox · OneDrive backup · job cost roll-up

SITE DIARY · TODAY DRAFT

SITES VISITED · 8.5 HRS

73 Princes Hwy · 6.5H 21 Tyrrell · 1.5H HQ programme · 0.5H
Weather12° clear SW 22
Crew on site14 onsite (73P) · 3 (Tyrrell)
Photos uploaded18 / 10 target ✓
Holds / blockersReservoir HWS no-show
Safety incidentsclear
Variations raised1 · 73P bathroom Rev C
INBOX → JOB COST CENTRE AI · LIVE

17 scanned today · 16 auto-allocated to site mgr bucket · 1 needs your call

73 Princes Hwy · Werribee

9 emails · Mariana (Rev C), Caleb (PO), subs

6.5H

AUTO

21 Tyrrell Ave · Blackburn

5 emails · sparky inspection, fit-out start

1.5H

AUTO

18 Brunswick · close-out · REVIEW

2 emails · final defect punch — bill to which?

0.0H

PENDING

ONEDRIVE BACKUP PENDING
Last full sync02:00 today
Live mirror3 min ago ✓
Today's logqueued · unsigned
Queued files19 (diary + 18 photos)
Storage128 GB / 1 TB

DESTINATION PATH

/1reference/daily-logs/
2026-06-28_DrazenGrgat.json

Submit to lock the day's entry and push to backup.

JOB COSTING · INTERNAL TEAM HOURS · YOUR ALLOCATION SITE MANAGER RATE · $150/HR · COMPARED TO ALLOCATED BUDGET
Job / address Your role Budget Spent WTD Today + Used % Status

73 Princes Hwy

Werribee VIC · lock-up

Site manager — primary $28,000 $24,150 +$975
86%
WATCH

21 Tyrrell Ave

Blackburn VIC · fit-out start

Site manager — partial $9,000 $3,200 +$225
36%
ON BUDGET

18 Brunswick

Brunswick VIC · close-out

Site manager — close-out $4,000 $4,680 +$0
117%
OVER · $680

HQ programme planning

Hillbrook · programme + admin

Site manager admin $3,000 $1,920 +$75
64%
ON BUDGET

TODAY TOTAL

8.5 hrs · 4 jobs · $1,275 today · auto-allocated from inbox + diary

$44,000 $33,950 +$1,275
77%
PORTFOLIO WATCH

AI flagged: 18 Brunswick is $680 over close-out budget — recommend Caleb re-baselines or pulls remaining defect hours off Drazen and onto maintenance crew.

YOUR PERSONAL PROJECTS · 4 ACTIVE

SEE ALL →

73 PRINCES · LOCK-UP

Build · due 18 Jul · 82%

21 TYRRELL · FIT-OUT START

Build · due Aug · 35%

PROGRAMME · Q3 REPLAN

Ops · due Jul · 55%

STUDY · CARPENTRY UPSKILL

Personal · due Dec · 22%

Drazen — 7 things need eyes today

  • Kingia Lot 1 · NDIS enrolment cert · pending 6d · occupant move-in 8 Jul
  • 5 invoices waiting your sign-off · $36,420 total · oldest AbleScape 3d
  • Cooper St · SDA plan stamp from Mariana · 4d overdue · holds permit
  • Storm Mon-Tue · 4 sites affected · roof Roberts Rd at risk
  • Ceiling hoist · Roberts Rd · installer flagged ceiling height issue
  • Westgate frame · over $5,800 (subbie variation)
  • Kingia Lot 2 · accessibility audit Wed · last check before PC
  • RFI #014 Gilbertson · ramp gradient · Mariana tagged

Your day at a glance

Active sites

7

4 build · 2 handover · 1 pre-site

Invoices to approve

5

$36,420 · oldest 3d

SDA compliance

94%

1 audit pending Kingia 2

Schedule

+2d

Westgate +4d · Kingia 1 −1d

Safety days clean

142

0 incidents · 0 near-miss

Today's route · Greenvale → NW sites → home

AI optimised by priority + handover urgency. 76km · 1h 52m drive · 7 stops

Home · Greenvale 1 Kingia 1 · NDIS sign 2 Kingia 2 · audit prep 3 62-41 Westgate 4 Gilbertson 5 Roberts · hoist 6 Locke St 7 Cooper · walk NORTHWEST · SDA
Stops · in order
  1. Leave home

    Greenvale

    7:30

  2. 1

    Kingia Lot 1 · handover

    60 min · NDIS cert chase · move-in 8 Jul

    7:55

  3. 2

    Kingia Lot 2 · audit prep

    45 min · accessibility checklist

    9:05

  4. 3

    62-41 Westgate · Pascoe Vale

    50 min · frame variation review

    10:10

  5. 4

    Gilbertson · Essendon

    40 min · ramp gradient RFI

    11:15

  6. 5

    Roberts Rd · ceiling hoist

    45 min · ceiling height issue

    12:15

  7. 6

    Locke St · Essendon

    35 min · plumbing rough-in

    1:35

  8. 7

    Cooper St · pre-site walk

    40 min · site setup planning

    2:30

  9. Home

    Greenvale

    3:45

SDA handover stage · Kingia Lot 1 + Lot 2

2 occupants waiting

Kingia Lot 1 · High Physical Support

SDA Provider · move-in 8 Jul (18d) · Mariana stamped

URGENT

Build

PC walk

Defects

NDIS cert

Move-in

  • NDIS enrolment cert 6d pending
  • Provider final inspect Tue 23 Jun
  • Occupant orientation 3 Jul
  • Keys + manuals · postcon 8 Jul

Kingia Lot 2 · Improved Liveability

SDA Provider · move-in 22 Jul (32d) · audit pending

AUDIT WED

Build

Audit

Defects

NDIS cert

Move-in

  • Accessibility audit Wed 24 Jun
  • Defects rectification 5d window
  • NDIS submission 2 Jul
  • Provider final inspect 15 Jul

Invoice approval · Procore workflow

Trade → Procore PO match → YOU → Caleb → Payment

AbleScape · accessible bathroom fitout

Invoice #AS-2026-0817 · 14 Jun · Kingia Lot 2 · SDA spec

YOU C $

$12,800

PO matched

3d waiting

AI: hoist + grab rails OK

Aussie Sparkies NDIS · compliance circuits

Invoice #AS-1124 · 15 Jun · Roberts Rd · SDA

! YOU C $

$9,640

PO $8,400 · over $1,240

2d waiting

AI: extra hoist circuit added

RampRight · entry ramp install

Invoice #RR-2026-44 · 17 Jun · Gilbertson · SDA

YOU C $

$6,420

PO matched

1d waiting

Boral · slab pour Westgate

Invoice #B-2026-4203 · 18 Jun · 62-41 Westgate Pascoe Vale

YOU C $

$4,860

PO matched

12h waiting

Bunnings Trade · consumables

Invoice #BN-9122 · 18 Jun · James cardholder · NW sites

YOU C $

$2,700

PO matched

6h waiting

Aussie Sparkies · Kingia 1 final

Yesterday · approved · with Caleb

C $

$3,180

With Caleb

Construction program · vs Caleb's master schedule

Aggregate +2d ahead
Site
JulAugSepOctNovDecJanFebMarAprMayJun
Subbie budget
vs program

Kingia Lot 1 SDA HPS

Handover · NDIS cert chase

Move-in 8 Jul

−$2,200

−1d ahead

Kingia Lot 2 SDA IL

Audit Wed · 32d to move-in

−$1,400

On time

62-41 Westgate · Pascoe Vale SDA

Frame · variation +$5,800 over

+$5,800

+4d slip

Gilbertson · Essendon SDA

Lockup · ramp gradient RFI

−$2,400

On time

Roberts Rd · Essendon SDA

Hoist installer · ceiling height issue

+$1,200

+2d at risk

Locke St · Essendon SDA

Plumbing rough-in

−$800

On time

Cooper St · Essendon SDA

Pre-site · awaiting Mariana stamp 4d

$0 yet

Permit hold

Coming your way · CRM pipeline for Northwest

3 likely · $4.8M est

MADINA Halal · Glenroy

HOT

SDA Robust · $1.6M · site-start 12 Aug

CRM stageContract executed
MarianaPlans signed
Caleb adds you~8 weeks

7 McLachlan · Bacchus Marsh

SIGNED

SDA IL · $1.4M · site-start Sep

CRM stageSales closed
Marianav2 review
Caleb adds you~12 weeks

[ECI] BEL2 · Belmont

ECI

SDA HPS · Good Housing · $1.8M · Nov

CRM stageECI v3
MarianaDesign w/ VL
Caleb adds you~20 weeks

If all 3 land + Kingia 1 + 2 handover on time, your workload eases to 82% in Sep · capacity for one more SDA

Workload forecast →

Safety + SDA audit · 142d clean

SDA accessibility audit · Kingia 2

Wed 24 Jun · prep checklist + brief auditor

Roof works · Roberts Rd

Storm Mon · cover + secure scaffolding Sun

Inspection logged · Westgate

Wed 18 · clean · MUS shed orderly

Toolbox talk · Locke St

Mon 16 · plumbing crew · SDA brief

RFIs · open

  • #014 · Gilbertson ramp gradient 2d

    To Mariana · 1:14 vs site fall

  • #013 · Roberts Rd hoist clearance 3d

    To Mariana · ceiling +120mm needed

  • #012 · Cooper St SDA classification 4d

    To Mariana · HPS vs IL spec confirm

  • #011 · Kingia 1 occupant orientation Closed

    Resolved · provider confirmed Tue

Ask the docs · AI chat

Recent searches

  • HPS ceiling hoist clearance

    → SDA Design Std s4.3 · 2700mm min · joist trim

  • NDIS enrolment checklist

    → SharePoint · SDA Templates · NDIS pack v4

Urgent email

Kingia Provider · "Move-in 8 Jul still on?"

AI: "NDIS cert pending 6d. Reply: 'Following up Monday, confirm Thu.'"

My site cameras · 7 sites

6 live · 1 offline
LIVE

Kingia 1

LIVE
LIVE

Kingia 2

LIVE
LIVE

Westgate

LIVE
LIVE

Gilbertson

LIVE
LIVE

Roberts Rd

LIVE
LIVE

Locke St

LIVE
OFFLINE

Cooper St

Pre-site

Order cam

Weather + EOT · NW Melbourne

Storm Mon-Tue

Sun

14°

Mon

10°

Tue

Wed

12°

Thu

14°

Fri

16°

Sat

15°

AI EOT drafts

  • Roberts Rd roof · cover Sun + delay 1d
  • Westgate frame · push Tue→Thu
  • Locke plumb rough-in · indoor · proceed